The specialist bench

Every agent, and exactly what it's accountable for

Each agent has one job, one set of guardrails, and a defined review requirement — grouped below by discipline.

Executive

Engineering

Architecture Agent

Produce architectural solutions that satisfy the project's cataloged municipal zoning, setback, and accessibility requirements.

High risk
Engineer review required

BIM Coordinator

Coordinate all disciplines' models to detect and resolve geometric clashes before construction documentation is issued.

High risk
Engineer review required

Electrical Agent

Design an electrical strategy that satisfies the project's cataloged Saudi Electricity Company (SEC) connection requirements and electrical code provisions.

Critical risk
Engineer review required

Fire Protection Agent

Design life-safety and fire-protection systems that satisfy the project's cataloged Saudi Civil Defense approval requirements and fire-code provisions.

Critical risk
Engineer review required

Geotechnical Agent

Assess ground conditions and foundation options against the project's provided investigation data and cataloged Saudi seismic zoning.

High risk
Engineer review required

Interior Design Agent

Review interior design for material selection, furniture layout, and the functional, accessibility, and privacy requirements the client specifies.

High risk
Engineer review required

Landscape Agent

Design external landscape areas using planting and irrigation strategies suited to the project's arid-climate region and any cataloged municipal green-space requirements.

High risk
Engineer review required

Low Current Agent

Design low-current/ICT infrastructure (CCTV, access control, structured cabling, public address) sized to the project's operational requirements.

High risk
Engineer review required

Materials & Specifications Agent

Tie each specified material to its governing regulation, standard and required test.

High risk
Engineer review required

Mechanical Agent

Design HVAC systems sized to the project's climate design data and the cataloged Saudi energy-efficiency and thermal insulation requirements.

Critical risk
Engineer review required

Plumbing Agent

Design water supply and drainage systems that satisfy the project's cataloged municipal/utility connection requirements.

Critical risk
Engineer review required

Roads Design Agent

Review road geometry, classification and pavement basis against the cataloged road standards.

High risk
Engineer review required

Structural Agent

Review structural feasibility.

Critical risk
Engineer review required

Survey Agent

Establish site geometry and boundaries referenced to the project's cataloged geodetic datum and municipal survey submission requirements.

High risk
Engineer review required

Urban Planning Agent

Assess urban context, land use, and mobility against the project's cataloged municipal planning regulations.

High risk
Engineer review required

Operations

Quality

Support

Administration